Free event planning checklist
Choose the kind of event and put in the date. Every task gets a due date counted back from it, with a box to tick, an owner and a place for notes. If your date is closer than a task usually needs, it moves to the top as catch up now instead of showing a date that has gone. Download the dates as a CSV or a calendar file, or print the list. No signup.
The list below is a sample: a corporate event about six months from today. Switch the type or change the date and the whole plan moves.
Your checklist
Saturday, April 24, 2027, in 188 days
0 of 84 done, 9 due this week.
A sample plan. Put in your own date and the list moves with it.
Corporate event checklist
Saturday, April 24, 2027. 0 of 84 done, 9 due this week.
6 to 9 months out 0 of 9 done
Oct 24, 2026
- Sat, Oct 24, 2026
Every later choice about the room, the food, the hours and the guest list gets easier to say yes or no to.
- Sat, Oct 24, 2026
Keep a reserve for what quotes leave out: service charges, tax, tips and overtime. We hold back about a tenth.
- Sat, Oct 24, 2026
A group can plan, but vendors need to hear a single answer.
- Sat, Oct 24, 2026
Check school breaks, long weekends and the calendars of the people who must be there, then ask the venue which date it can hold.
- Sat, Oct 24, 2026
The headcount decides the room, the food, the bar and the budget, so a rough number now beats an exact one in six months. Guest list template
- Sat, Oct 24, 2026
Send the same email to all three: dates, headcount, hours, and whether food and bar are included.
- Sat, Oct 24, 2026
A posted maximum is usually standing. A seated dinner with a dance floor holds far fewer. Capacity calculator
- Sat, Oct 24, 2026
Attendance, a feedback score, leads or a decision. Choose before the invitations go out.
- Sat, Oct 24, 2026
Include who can approve overruns.
3 to 6 months out 0 of 14 done
Nov 24, 2026 to Jan 24
- Tue, Nov 24, 2026
Put every signed agreement and every payment receipt there, so nobody hunts through email in the last week.
- Tue, Nov 24, 2026
Use the owner box on every task here. A task with no name beside it is a task nobody does.
- Tue, Nov 24, 2026
Look at load-in, restrooms, parking, the walk from the car to the door, and where a caterer would stage.
- Tue, Nov 24, 2026
A verbal hold is no hold. Ask what happens if someone else wants the same day.
- Tue, Nov 24, 2026
Find out what you lose if you cancel, what a move costs, and the hourly rate if the event runs long. Rental agreement template
- Tue, Nov 24, 2026
Keep the signed copy and the receipt in the shared folder.
- Tue, Nov 24, 2026
A date that works for the leaders decides who else will come.
- Thu, Dec 24, 2026
Music end time, noise limit, candles and open flame, confetti, what you may hang or tape, and whether you can bring your own alcohol.
- Thu, Dec 24, 2026
If outside vendors are allowed, ask what each must provide, such as a certificate of insurance, a license or a food permit.
- Thu, Dec 24, 2026
Final guest count, menu choices, floor plan, vendor list and insurance, each with a date. Those dates, not ours, set your plan.
- Thu, Dec 24, 2026
Ask for the price per guest with service charge and tax, the minimum, and what happens to the price if the count drops. Catering calculator
- Sun, Jan 24, 2027
Find out the cutoff, what a lower count costs, and whether a higher count depends on the kitchen.
- Sun, Jan 24, 2027
Many venues want event liability cover that names them. Ask for the exact wording they need on the policy.
- Sun, Jan 24, 2027
Keep sessions short and leave time to walk between rooms. Run of show template
1 to 3 months out 0 of 21 done
Feb 13 to Mar 20
- Sat, Feb 13, 2027
Amplified sound, alcohol you supply, a raffle, a food truck or a street closure may each need one. Rules differ by city and state, so ask.
- Sat, Feb 13, 2027
Price each one for your guest count and hours before you choose. Open bar calculator
- Sat, Feb 13, 2027
Check what is in the price: staff, setup, cleanup, plates and linens. Catering contract template
- Wed, Feb 24, 2027
Pick dishes that hold well under a lid, and settle the vegetarian and children’s options now, not at the final count.
- Wed, Feb 24, 2027
Finance will ask, so ask first.
- Sat, Feb 27, 2027
Walk the route from the drop-off to the seat, then tell the venue what you find.
- Sat, Feb 27, 2027
Deposit, balance date, cancellation, overtime and arrival time on the same page.
- Sat, Feb 27, 2027
Ask how many hours are included, when the files arrive, and who owns the rights.
- Sat, Feb 27, 2027
Ask what the in-house tech costs, how many wireless microphones there are, and whether anyone can sound-check the day before.
- Sat, Feb 27, 2027
Tables, stage, bar, dance floor, buffet and exits. Check aisle widths before the fire marshal does. Floor plan maker
- Sat, Feb 27, 2027
Ask on the reply form, and send the caterer the list with the final count. Guest list template
- Sat, Feb 27, 2027
If you supply the alcohol, ask the venue about corkage, who serves it and who may open the bottles. Alcohol calculator
- Sat, Mar 13, 2027
Use the date in your contract. If it is silent, we use six weeks out, so a rejected certificate can be fixed in time.
- Sat, Mar 13, 2027
Chairs, tables, linens, a tent, a dance floor, a bar. Ask the venue which of them are included. Tablecloth calculator
- Sat, Mar 13, 2027
Ask before you buy: some rooms ban tape, nails and open flame.
- Sat, Mar 13, 2027
Where guests park, whether the lot has a cap, how late rideshares run, and who to call when someone is stuck.
- Sat, Mar 13, 2027
Ask the venue what its rules say about a bartender you hire yourself.
- Sat, Mar 13, 2027
Get a proof, and spell-check every name.
- Sat, Mar 20, 2027
Seat the people who said yes, keep households together, and leave a few chairs spare. Seating chart maker
- Sat, Mar 20, 2027
Put the reply-by date at least a week before the venue’s final count date. Guest list template
- Sat, Mar 20, 2027
One message with the address, the start time and the arrival window.
4 weeks out 0 of 9 done
Mar 27 to Apr 10. The last month, down to two weeks before.
- Sat, Mar 27, 2027
Ask the venue where signs may stand and what they may be fixed with.
- Sat, Mar 27, 2027
Start times, who speaks or serves, and the sound, light and slide cues, in one document. Run of show template
- Sat, Mar 27, 2027
Also get the loading door, the elevator rules and the first time anyone may enter the room.
- Sat, Apr 3, 2027
The first ten minutes set the mood, and a lost guest at the door is a problem for the whole evening.
- Sat, Apr 3, 2027
A text beats a second email. Keep pending and declined visible so the count stays honest. Guest list template
- Sat, Apr 3, 2027
It lists times, menu counts, bar, room set and staffing. Read it line by line and ask for a corrected version, not a verbal fix. BEO template
- Sat, Apr 3, 2027
Overtime is often billed by the hour. Agree who takes down, who takes the trash out, and who signs off at the end.
- Sat, Apr 10, 2027
One file, one version. Delete the old copies from the shared folder so nobody works from them.
- Sat, Apr 10, 2027
Someone who knows where the keys, the cash and the contact sheet are if the main person is stuck.
1 week out 0 of 7 done
Apr 14 to Apr 21. From two weeks to three days before.
- Wed, Apr 14, 2027
The date is in your contract. Ask what happens if the count changes after it. Guest list template
- Wed, Apr 14, 2027
One table: vendor, amount, due date, paid by.
- Sat, Apr 17, 2027
Check the floor plan against the room, the power, the lighting, the restroom supplies and where the trash goes. Floor plan maker
- Sat, Apr 17, 2027
Power, water, a table, a meal, parking.
- Sat, Apr 17, 2027
Every vendor’s mobile number, the venue manager, and the one person who decides if something goes wrong.
- Sat, Apr 17, 2027
Ask for the names on the special-meal plates, so each one lands at the right seat.
- Wed, Apr 21, 2027
A name on each, and one person to hand them out.
The day before 0 of 5 done
Apr 23
- Fri, Apr 23, 2027
Get the name of who took it and where it is kept.
- Fri, Apr 23, 2027
Ask early: some venues charge for it and some do not allow it.
- Fri, Apr 23, 2027
Tape, scissors, safety pins, a stain stick, phone chargers, pain relievers and cash for tips.
- Fri, Apr 23, 2027
Phones die and Wi-Fi drops. Paper does not.
- Fri, Apr 23, 2027
The people running the day need sleep more than one more decoration.
The day 0 of 8 done
Apr 24
- Sat, Apr 24, 2027
Agree where deliveries go and who has the keys.
- Sat, Apr 24, 2027
Tables, chairs, exits clear, signs, the bar and the stage. Floor plan maker
- Sat, Apr 24, 2027
Have the contact sheet in your hand, not in your car.
- Sat, Apr 24, 2027
If you are the host, that person is not you.
- Sat, Apr 24, 2027
Put a 15 minute meal on the timeline.
- Sat, Apr 24, 2027
Use the labelled envelopes.
- Sat, Apr 24, 2027
Photograph anything damaged before you leave, and ask when the deposit decision is made.
- Sat, Apr 24, 2027
Gifts, cards, rentals to return, leftover food boxed and your own belongings.
After the event 0 of 11 done
Apr 25 to May 22
- Sun, Apr 25, 2027
Count items back in with the supplier and keep the receipt.
- Sun, Apr 25, 2027
Keep it to five questions.
- Tue, Apr 27, 2027
Say what you decided and who owns it.
- Sat, May 1, 2027
Ask for the inspection result too, so any deduction is explained.
- Sat, May 1, 2027
Match each invoice to its agreement before you pay.
- Sat, May 8, 2027
A short note naming one specific thing they did well is read and remembered.
- Sat, May 8, 2027
Send one link to everyone and ask for a reply by a date.
- Sat, May 8, 2027
Do it now. In a month you will remember only the good parts.
- Sat, May 8, 2027
Report the actual cost against the budget.
- Sat, May 15, 2027
It is the cheapest thank-you there is.
- Sat, May 22, 2027
You will want them again, for the next event or for taxes.
Add your own task
Free with no account. The checklist stays in this browser and is never sent anywhere. The CSV opens in Excel and Google Sheets; the calendar file adds each open task to Google Calendar, Apple Calendar or Outlook on its due date.
An event planning checklist works backward from the date. We start a wedding or a conference 12 months out, a gala about 9, a corporate event about 6 and a birthday or party about 2. Fix the date and the venue first, then the budget, then the guest list, then everything the venue’s deadlines ask for: the contract, the insurance certificate, the floor plan, the BEO and the final count. The checklist above does the sums: put in the date and each of its 173 tasks gets a due date.
How far ahead to plan an event
As far ahead as the room sells out. A venue with a handful of good dates can fill them a year ahead, and a restaurant’s back room can come together in a month. Vendors who work alone, like a photographer, a band or an officiant, hold one date at a time, and guests who travel need months of notice.
This table is the lead time the checklist uses for each kind of event. They are rules we use, not survey results, and a venue that books up early can ask for more. Change the date above and every one of them moves with it.
| Kind of event | Start planning | Venue secured by | Invitations out | Final count to the venue |
|---|---|---|---|---|
| Wedding | 12 months | 10 months | 8 weeks | 2 weeks |
| Birthday or party | 2 months | 5 weeks | 3 weeks | 1 week |
| Corporate event | 6 months | 5 months | 5 weeks | 10 days |
| Fundraiser or gala | 9 months | 8 months | 8 weeks | 2 weeks |
| Conference or workshop | 12 months | 11 months | 10 weeks | 10 days |
A shorter runway isn’t a disaster; it means fewer choices. With five weeks to go you take the caterer the venue already works with and the photographer who’s free, and skip tasks that need a long lead. The catch up now group shows which.
The order that works: date, venue, budget, guest list
Most people start with the guest list, then look for a room, then find the room costs more than the budget they hadn’t set. We run it the other way, because each step constrains the next.
1. The date and the venue, together
The room decides the date and the date decides the room, so shortlist both at once. Ask three venues about the same three dates, and ask your favorite to hold one in writing. Then check the room holds your headcount in the layout you want; a posted maximum is usually a standing number.
2. The budget
The venue quote can set the rules for food and drink, so a budget only becomes real once you hold one. Write the ceiling before you tour, and keep a reserve for what quotes leave out: service charges, tax, tips and overtime.
3. The guest list, as a range
You need a rough headcount to choose a room, not an exact one. Draft the list early and let the replies make it exact; the final number matters on the day the venue and caterer need it, which your contract states.
4. The vendors, scarcest first
Book whoever has the fewest substitutes first: the caterer if the venue lets you choose, then music, the photographer and anyone who needs a permit. Then comes the paper: insurance, the floor plan, the run of show, the BEO and the final count.
A sample six-month event planning timeline
This is the corporate preset, six months out, with the venue still to book: the plan the checklist above starts with, in short. Weddings and galas start earlier and parties later, but the shape is the same.
| When | What happens |
|---|---|
| 6 months | Write the goal, set the budget, name one person who decides, pick three possible dates, draft the guest list, shortlist three venues and ask if the dates are free. |
| 5 months | Tour the top two venues, get a written hold, read the cancellation and overtime terms, sign and pay the deposit. Split the work. |
| 4 months | Get the venue’s house rules, vendor list and deadline sheet. Book the caterer. |
| 3 months | Buy the event insurance the venue asks for. Draft the agenda. Ask how late changes to the count are handled. |
| 2 months | Taste the menu. Ask the venue how it invoices. Settle the bar and any permits. |
| 6 to 8 weeks | Book the photographer, confirm sound and screens, draw the floor plan, send the certificate of insurance, order badges. |
| 4 to 5 weeks | Send invitations with a reply-by date. Write the run of show. Get the load-in time and where vendors park. |
| 2 to 3 weeks | Chase replies, confirm the BEO, confirm load-out, send the final count, list every vendor balance, share the plan. |
| The last week | Walk the room with the venue manager, call every vendor, make the contact sheet. |
| The day before and the day | Drop off what the venue holds, print the paper copies, walk the room against the floor plan, then run the day. |
What people forget
The tasks that cost money when they’re missed are the unglamorous ones, and nearly all of them are the venue’s.
- The overtime rate and when it starts. Read the contract for it. An hour over can cost more than an hour of the room.
- Load-in and load-out. What time vendors may arrive, where they park, and when the room has to be empty. Ask the venue before you book the band.
- The final count is due earlier than the event feels. The date is in the contract, often a week or two out. The checklist puts it on the calendar.
- The certificate of insurance. Many venues want one from you and from some vendors, and a rejected certificate takes days to fix.
- Who clears the room. Name the person who takes down, takes out the trash and signs off with the venue manager.
- Feeding the people who work the event. Give the caterer a count.
- Tips and final payments. Put them in labelled envelopes the day before, with one person to hand them out.
Most of those turn up in one document, the banquet event order (BEO) your venue sends before the event: times, counts, bar, room set, staffing. Reading it line by line two weeks out is worth the time.
On the day, the free wedding day emergency kit checklist covers the bag of fixes, tools and paper that goes with you.
Day-of schedule: an event schedule template
A checklist says what to do and by when. A schedule says what happens at which minute, and who is doing it. You need both, and you build the second from the first: once the load-in time, the doors time and the end time are fixed, the rest falls into place around them.
Here is a sample for an evening dinner event. The free run of show template builds the same thing from your start time: add a segment, set its length and every time below it moves. For a wedding, the free wedding timeline template starts from the ceremony time instead.
| Time | What happens | Owner |
|---|---|---|
| 2:00 PM | Load-in opens; vendors check in with the venue manager | Venue |
| 3:30 PM | Room set against the floor plan; walk the room | Planner |
| 4:30 PM | Sound check and speaker run-through | AV |
| 6:00 PM | Doors, check-in, bar opens | Planner |
| 7:00 PM | Guests seated; welcome | MC |
| 7:15 PM | Dinner service | Caterer |
| 8:15 PM | Program and speakers | MC |
| 10:30 PM | Last call; load-out starts | Venue |
| 11:30 PM | Room empty; walk it with the venue manager | Host |
How to run the plan with a team
A checklist with no owners is a wish list. Put a name beside every task in the Owner box, and check that each person knows they have it. A few habits we use:
- One person decides money and changes. Everyone else advises.
- One shared folder holds every signed agreement and receipt.
- The team meets for 15 minutes once a week, opens the Overdue and Due this week filters and leaves with their own tasks.
- Anything a vendor says by phone gets written in the Notes box that day.
The checklist saves in your browser, on this device, and isn’t shared live, so let one person keep the master. Send everyone else the CSV, which opens in Excel and Google Sheets and sorts by owner, or the calendar file, which puts each open task on its due date in Google Calendar, Apple Calendar or Outlook. If the date changes, download again and delete the old calendar entries first, because an import adds events rather than replacing them.
For venues and coordinators
Hand this page to your clients. It does the nagging you would otherwise do by email: the date to book the caterer, the date the certificate is due, the date the final count locks.
Your deadlines set the plan
A template can guess at most dates, but it can’t know yours. The final count, the menu lock, the balance, the insurance certificate, load-in and load-out come from your contract and decide when a client’s work is really due. Send the deadline sheet at signing and ask clients to enter each date with Add your own task.
One event, one dashboard
Most of what clients ask is “what do you need from me, and by when?” In MyVenueHQ the inquiry, the contract, the floor plan and the BEO sit on one event, so the answer is in the same dashboard as their contract and invoice. Draw the room with the free event floor plan maker, write the event order with the free BEO template, and when you want them on every booking, start free: it costs nothing for one venue and up to 10 events a month (pricing).
Add this event planning checklist to your website
Venues, planners and wedding blogs can put it on their own site for free. Paste this where you want it; it works in WordPress, Squarespace, Wix and plain HTML. Nothing is tracked about your visitors beyond page views.
Planning questions.
How far ahead should you plan an event?
Start from how far ahead the room sells out. The rules we use are 12 months for a wedding or a conference, about 9 for a gala, about 6 for a corporate event and 2 for a birthday or party. Put your real date in the checklist above and every task shows its own due date.
What goes on an event planning checklist?
The goal and the budget, the date and the venue, the guest list, the big vendors (food, drink, music, photos), the paperwork (contracts, insurance, permits), the floor plan and run of show, the final count, the day-before and day-of jobs, and the aftermath: rentals, thank-yous, the deposit. This one adds the venue’s own deadlines, which most lists leave out.
How is a wedding checklist different from a corporate event checklist?
A wedding starts earlier (12 months against about 6) and is personal: attire, rings, the license, the rehearsal. A corporate event needs a sponsor’s sign-off, a measure of success, an agenda, a purchase order and a closing report. The venue-side work is identical: hold the date, read the contract, send the count, confirm load-in. Pick the type above and the tasks swap over.
Who is responsible for what?
The host owns the money, the decisions, the guest list and the final count. The venue owns the room, its house rules, its deadlines and its staff. A planner or coordinator owns the timeline, the vendors and the day, and each vendor owns its own work and arrival time. Put a name in the Owner box on every task.
What do I do with a short timeline?
Put in the real date. Tasks that should already be done move to Catch up now, at the top, in the order they matter. Do the date and venue first, then the budget, a draft guest list and the caterer. Ask the venue which deadlines are fixed, then cut scope: fewer guests, a weekday, a simpler menu, the venue’s in-house services.
How do I plan a party on a small budget?
Set a ceiling and spend it on food, a place to sit and music, in that order. Use a space that costs little (a backyard, a community room, a park with a permit), cook one big dish or ask friends to bring one each, and keep the list to the people you would miss. The catering and alcohol calculators stop you buying too much.
Is the checklist free?
Yes. There is no account, no email and no limit. It saves in your browser on this device, and you can download the tasks as a CSV or as a calendar file, or print it. Venue teams can use MyVenueHQ free for one venue and up to 10 events a month.